6.13 Sealing Slide and Sealing Plate
Ⅰ Dominant Item
6.13.1 Countersunk-headed screw for fixing sealing slide must lower than sliding face of the slide.
Check quantity:to check all.
Inspection method:inspection.
6.13.2 Preset thermal expansion gap for every part of sealing slide,must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation quality records or to take actual measurements.
Ⅱ General Item
6.13.3 Tolerance for installation of sealing slide shall meet requirements in Table 6.13.3,see Figure 6.13.3.
Examination:to check all.
Inspection method:see Table 6.13.3.
Table 6.13.3 Tolerance for installation of sealing slide
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_23.jpg?sign=1738987742-L1U9jxBFsOWUz0PVQFgba2Xy1LhpS8q0-0-4acff2b31954dad72de5ed20f2bce742)
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_24.jpg?sign=1738987742-3UCM6MoCXBE45E7J0O3fDmYChlpkypKN-0-fc1ffdfc09e3094934cd6b5db10a5ef8)
Figure 6.13.3 To survey elevation of sealing slide
1-Trolley rail;2-Sealing slide;3-Longitudinal centerline of sintering equipment
6.13.4 Tolerance for installation of plate movable sealing plate shall meet requirements in Table 6.13.4.
Check quantity:to check all.
Inspection method:see Table 6.13.4.
Table 6.13.4 Tolerance for installation of plate movable sealing plate
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_25.jpg?sign=1738987742-DddPDzWneF44audD335e9Aw5vasDypIO-0-d4eade15d493ff58873192e3f19daf74)