![DL/T5210.3-2009电力建设施工质量验收及评价规程第3部分:汽轮发电机组(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/812/33688812/b_33688812.jpg)
4.7 Water Cooled Condenser Assembly and Erection
4.7.1 Condenser(steam exhaust device)erection.
Applicable scope:applicable to condenser(steam exhaust device)erection,with the following inspection items:condenser(steam exhaust device)shell assembly,condenser(steam exhaust device)in place and alignment.
1 Condenser(steam exhaust device)shell assembly inspection and acceptance are given in Table 4.7.1-1
Table 4.7.1-1 Condenser(steam exhaust device)shell assembly
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_289.jpg?sign=1739371567-bZN1SfBpysP16iCIA2feOREBtFpkgAXf-0-6b8574c6fba2f63999f63a81d2adcae8)
2 Condenser(steam exhaust device)in place and alignment inspection and acceptance are given in Table 4.7.1-2.
Table 4.7.1-2 Condenser(steam exhaust device)in place and alignment
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_290.jpg?sign=1739371567-9dw8pRpUNwx4ZnYC3wFmq8TzQ3bYhOSv-0-7ecb4eca1d85460df33f48b2423fb0cc)
4.7.2 Condenser cooling tube bundle erection inspection and acceptance are given in Table 4.7.2.
Table 4.7.2 Condenser cooling tube bundle erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_291.jpg?sign=1739371567-cCQzeUybRCgptJmHk1efSbTl3ANNX5is-0-d79d40a10835ea2b6ebb10a9ef0189be)
Table 4.7.2(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_292.jpg?sign=1739371567-k8H5xEX2DCdHV1ohbV3XDo3GkaCoIuAE-0-0def3f185a1195a10b07117a1891b476)
4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test inspection and acceptance are given in Table 4.7.3.
Table 4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_293.jpg?sign=1739371567-rWPKfgr8Zq8I6KpcJZ8xu6mpqgI327rS-0-829c2fb231006aa8d413782485f2c934)
4.7.4 Condenser(steam exhaust device)accessories erection and secondary grouting inspection and acceptance are given in Table 4.7.4.
Table 4.7.4 Condenser(steam exhaust device)accessories erection and Secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_294.jpg?sign=1739371567-QHdBHhpgZ7fHui6Lvum3y9pT9tPc1FUS-0-1f89b28a29b969622c2d3ca1876ba0aa)
4.7.5 Rubber ball cleaner inspection and erection inspection and acceptance are given in Table 4.7.5.
Table 4.7.5 Rubber Ball Cleaner Inspection and Erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_295.jpg?sign=1739371567-V7fOTFK2h4ZT80jKjIcIdcVJ4wzkVQJv-0-7dc12befface5450204e238b95ef4a98)
4.7.6 Mandatory provision implementation inspection of water cooled condenser assembly erection is given in Table 4.7.6.
Table 4.7.6 Mandatory provision implementation inspection table of water cooled condenser assembly erection subsection project
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_296.jpg?sign=1739371567-Pkc8nUNRmLS29NrzXm9ohGNX94GMzOKG-0-4a017d84a6afb3abf6638019011f4254)