GB 50372-2006 炼铁机械设备工程安装验收规范 (英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

7.4 Valve Box

Ⅰ Dominant Items

7.4.1 The packing(backing)seal on the flange face between valve box and butt flange of charging bucket shall meet the requirement in the design documents.They shall be closely contacted and the connecting bolts shall be evenly fastened,the fastening force of bolts shall meet the requirements in the design documents.

Check quantity:full check.

Check method:observe,check the bolt fastening records or trial fastening by a wrench.

Ⅱ General Items

7.4.2 The allowable installation deviation of traveling track for valve box shall meet the requirements in Table 7.4.2.

Check quantity:full check.

Check method:see Table 7.4.2.

Table 7.4.2 Allowable installation deviation of traveling track for valve box(mm)

img

7.4.3 The allowable installation deviation of fixed valve box shall meet the requirements in Table 7.4.3.

Check quantity:full check.

Checkmethod:see Table 7.4.3.

Table 7.4.3 Allowable installation deviation of fixed valve box(mm)

img