5.7 Installation of Frame

Ⅰ Dominant Items

5.7.1 The deformation and peeling of paint on steel element due to handling,piling and hoisting shall be corrected and repaired.

Check quantity:10% random check for elements and at least 4 pieces.

Check method:observe or pull line and check with a steel rule.

Ⅱ General Items

5.7.2 The allowable installation deviation of top rigid frame and frame shall meet the requirements in Table 5.7.2.

Check quantity:full check.

Check method:see Table 5.7.2.

Table 5.7.2 The allowable installation deviation of rigid frame and frame(mm)

img

Note:H refers to column height.

5.7.3 The allowable installation deviation of supports for top equipment shall meet the requirements in Table 5.7.3.

Check quantity:full check.

Check method:see Table 5.7.3.

Table 5.7.3 Allowable installation deviation of supports for top equipment(mm)

img